The Zips Baja team started frame fabrication on November 3rd, 2012 on their 2013 car. The front suspension box and firewall were started with the assistance of jigs to increase accuracy. The aluminum seat was cut out with Ward Jet’s assistance and finished by the team. Additional progress was made on dyno testing mounting plate and tire testing mounting brackets.